رسالة جامعية

Delay time analysis in maintenance

التفاصيل البيبلوغرافية
العنوان: Delay time analysis in maintenance
المؤلفون: Redmond, D. F.
بيانات النشر: University of Salford, 1997.
سنة النشر: 1997
المجموعة: Ethos UK
Original Material: http://usir.salford.ac.uk/2157Test/
مصطلحات موضوعية: 658, TA Engineering (General). Civil engineering (General) : Built and Human Environment
الوصف: The thesis develops the application of delay time analysis to the area of mathematical modelling of planned maintenance and inspection of industrial systems. Chapter 1 gives an introduction to the history and techniques in use of maintenance modelling and surveys appropriate literature in the field. A section is devoted to papers published on delay time analysis. Chapter 2 introduces and develops mathematical models for modelling the reliability, maintenance and inspection of repairable systems. Chapter 3 gives an account of parameter estimation and model updating techniques in the light of subjective and observational data sets collected over a period of system operation. Chapter 4 addresses a bias in the probability distribution function of delay time when the data available over an operating survey is censored. Parameter estimation methods for this situation are then proposed. Chapter 5 gives an account of a simulation study of the delay time models and verifies the theory and parameter estimation techniques. Chapter 6 reports on research supported by the Science and Engineering Research Council on the application of delay, time analysis to concrete structures. Finally, Chapter 7 collates the conclusion drawn on each chapter and recommends areas for further research.
Original Identifier: oai:ethos.bl.uk:360383
نوع الوثيقة: Electronic Thesis or Dissertation
الإتاحة: http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.360383Test
رقم الانضمام: edsndl.bl.uk.oai.ethos.bl.uk.360383
قاعدة البيانات: Networked Digital Library of Theses & Dissertations