دورية أكاديمية

First to signal criterion for comparing control chart performance.

التفاصيل البيبلوغرافية
العنوان: First to signal criterion for comparing control chart performance.
المؤلفون: Rigdon, Steven E.1 (AUTHOR) steve.rigdon@slu.edu, Stevens, Nathaniel T.2 (AUTHOR), Wilson, James D.3 (AUTHOR), Woodall, William H.4 (AUTHOR)
المصدر: Quality Engineering. 2024, Vol. 36 Issue 2, p427-438. 12p.
مصطلحات موضوعية: *QUALITY control charts, CUSUM technique, SIGNAL sampling, SIGNAL processing
مستخلص: Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of "first to signal" and compare charts based on this criterion. [ABSTRACT FROM AUTHOR]
Copyright of Quality Engineering is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Business Source Index
الوصف
تدمد:08982112
DOI:10.1080/08982112.2023.2223690