-
1دورية أكاديمية
المؤلفون: Shafiee, Mahmood, Labib, Ashraf, Maiti, Jhareswar, Starr, Andrew
مصطلحات موضوعية: Maintenance strategy selection, multi-component system, analytic network process, cost-risk criticality, analytic hierarchy process, wind turbine
العلاقة: Shafiee M, Labib A, Maiti J & Starr A (2019) Maintenance strategy selection for multi-component systems using a combined analytic network process and cost-risk criticality model, Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, Volume 233, Issue 2, pp. 89-104; https://doi.org/10.1177/1748006X17712071Test; http://dspace.lib.cranfield.ac.uk/handle/1826/14174Test
الإتاحة: https://doi.org/10.1177/1748006X17712071Test
http://dspace.lib.cranfield.ac.uk/handle/1826/14174Test -
2دورية أكاديمية
المؤلفون: Perrier, Quentin, Lavallard, Vanessa, Pernin, Nadine, Wassmer, Charles-Henri, Cottet-Dumoulin, David, Lebreton, Fanny, Bellofatto, Kevin, Andres, Axel, Berishvili Berney, Ekaterine, Bosco, Domenico, Berney, Thierry, Parnaud, Géraldine
المصدر: ISSN: 1938-2022 ; Islets, vol. 13, no. 1-2 (2021) p. 1-9.
مصطلحات موضوعية: info:eu-repo/classification/ddc/617, Pancreatic islet isolation, Human islet, Manufacturing procedure, Quality subject, Risk criticality, Risk mapping
العلاقة: info:eu-repo/semantics/altIdentifier/pmid/33616002; https://archive-ouverte.unige.ch/unige:155294Test; unige:155294
-
3
المؤلفون: Fanny Lebreton, Charles-Henri Wassmer, Axel Andres, Nadine Pernin, Vanessa Lavallard, David Cottet-Dumoulin, Quentin Perrier, Thierry Berney, Domenico Bosco, Kevin Bellofatto, Ekaterine Berishvili, Géraldine Parnaud
المصدر: Islets, Vol. 13, No 1-2 (2021) pp. 1-9
Isletsمصطلحات موضوعية: 0301 basic medicine, Risk analysis, Manufacturing procedure, Isolation (health care), Endocrinology, Diabetes and Metabolism, 030209 endocrinology & metabolism, Risk criticality, Quality subject, Risk Assessment, 03 medical and health sciences, 0302 clinical medicine, Endocrinology, Risk mapping, Medicine, Humans, Healthcare Failure Mode and Effect Analysis, geography, Risk level, Human islet, geography.geographical_feature_category, ddc:617, business.industry, Islet, Continuous training, 030104 developmental biology, Risk analysis (engineering), Pancreatic islet isolation, business, Risk classification, Quality assurance, Failure mode and effects analysis, Research Paper
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::1716335f9a1cf25c1f1042dd500cc66eTest
https://archive-ouverte.unige.ch/unige:155294Test -
4
المؤلفون: Andrew Starr, Jhareswar Maiti, Mahmood Shafiee, Ashraf Labib
المصدر: Shafiee, M, Labib, A, Maiti, J & Starr, A 2019, ' Maintenance strategy selection for multi-component systems using a combined analytic network process and cost-risk criticality model ', Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, vol. 233, no. 2, pp. 89-104 . https://doi.org/10.1177/1748006X17712071Test
مصطلحات موضوعية: Risk analysis, Computer science, 020209 energy, Analytic network process, 0211 other engineering and technologies, Analytic hierarchy process, 02 engineering and technology, analytic network process, multi-component system, Task (project management), wind turbine, Component (UML), 0202 electrical engineering, electronic engineering, information engineering, System failure modelling, Maintenance strategy selection, cost-risk criticality, Safety, Risk, Reliability and Quality, Selection (genetic algorithm), analytic hierarchy process, Maritime system safety, 021103 operations research, Condition-based maintenance, Business and Management, Maritime risk, Reliability engineering, Condition based maintenance, Criticality, Maintenance modelling, Failure data analysis, Reliability engineering, Asset management, TJ
وصف الملف: application/pdf
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::5307da155923edc60dcdffc5222a8aeaTest
https://kar.kent.ac.uk/79681/7/LABIB_2017_cright_JRR_Maintenance_Strategy_Selection_for_Multi_Component_Systems_using_a_combined_Analytic_Network_Process_and_Cost_Risk_Criticality_Model.pdfTest -
5مؤتمر
المؤلفون: Xianbo Zhao, B-G Hwang, YL See
مصطلحات موضوعية: Building not elsewhere classified, Green building, Retrofit, Risk management, Risk criticality, Mitigation, Singapore, archi, envir
-
6مؤتمر
المؤلفون: Zhao, Xianbo, Hwang, Bon-Gang, See, Yi Lin
المصدر: Zhao, X, Hwang, B-G, See, YL, (2015). Green retrofit projects : risk assessment and mitigation. -2015, Association of Researchers in Construction Management. Conference, Lincoln, UK, ARCOM, UK, p. 125-134, http://www.arcom.ac.uk/conf-intro.phpTest
مصطلحات موضوعية: Green building, Retrofit, Risk management, Risk criticality, Mitigation, Singapore, 120299 Building not elsewhere classified, archi, envir
-
7دورية أكاديمية
المؤلفون: B-G Hwang, Xianbo Zhao, YL See, Y Zhong
مصطلحات موضوعية: Building construction management and project planning, Green building, Retrofit, Risk management, Risk criticality, Risk mitigation
-
8دورية أكاديمية
المؤلفون: Hwang, Bon-Gang, Zhao, Xianbo, See, Yi Lin, Zhong, Yun
المصدر: Hwang, B-G, Zhao, X, See, YL, Zhong, Y, (2015). Addressing risks in green retrofit projects : the case of Singapore. Project management journal., Vol. 46, No. 4, p. 76-89 http://dx.doi.org/10.1002/pmj.21512Test
مصطلحات موضوعية: Green building, Retrofit, Risk management, Risk criticality, Risk mitigation, 120201 Building Construction Management and Project Planning
العلاقة: Project management journal., USA, 2015, Vol. 46, No. 4, p. 76-89; http://hdl.cqu.edu.au/10018/1037273Test; cqu:12760; http://dx.doi.org/10.1002/pmj.21512Test; eISSN:1938-9507
-
9دورية أكاديمية
المؤلفون: Hwang, B., Zhao, X., Gay, M.J.S.
المساهمون: BUILDING
المصدر: Scopus
مصطلحات موضوعية: Attractiveness, Critical success factors, Public private partnership, Risk allocation, Risk criticality
العلاقة: Hwang, B., Zhao, X., Gay, M.J.S. (2013). Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors. International Journal of Project Management 31 (3) : 424-433. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijproman.2012.08.003Test; http://scholarbank.nus.edu.sg/handle/10635/45810Test; 000316435900010
-
10دورية أكاديمية
المؤلفون: Zhao, X., Hwang, B.-G., Yu, G.S.
المساهمون: BUILDING
المصدر: Scopus
مصطلحات موضوعية: Company characteristics, Joint venture, Risk criticality, Risk management, Singapore, Underground construction
العلاقة: Zhao, X., Hwang, B.-G., Yu, G.S. (2013). Identifying the critical risks in underground rail international construction joint ventures: Case study of Singapore. International Journal of Project Management 31 (4) : 554-566. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijproman.2012.10.014Test; http://scholarbank.nus.edu.sg/handle/10635/45706Test; 000317372800007