-
1دورية أكاديمية
المؤلفون: Gul Polat, Ekin Eray, Befrin Neval Bingol
المصدر: Journal of Civil Engineering and Management, Vol 23, Iss 7 (2017)
مصطلحات موضوعية: supplier selection, MCGDM, fuzzy AHP, fuzzy TOPSIS, integrated approach, case study, Building construction, TH1-9745
وصف الملف: electronic resource
العلاقة: http://journals.vgtu.lt/index.php/JCEM/article/view/1200Test; https://doaj.org/toc/1392-3730Test; https://doaj.org/toc/1822-3605Test
-
2دورية أكاديمية
المؤلفون: Ekin Eray, Benjamin Sanchez, Carl Haas
المصدر: Buildings, Vol 9, Iss 5, p 105 (2019)
مصطلحات موضوعية: adaptive reuse of buildings, interface management system, circular economy, interface problems in construction projects, barriers in adaptive reuse projects, Building construction, TH1-9745
وصف الملف: electronic resource
-
3
المؤلفون: Derek Rayside, Ekin Eray, Carl T. Haas
المصدر: Journal of Management in Engineering. 37
مصطلحات موضوعية: Data collection, Process management, Interface (Java), business.industry, Strategy and Management, Project stakeholder, General Engineering, Workload, Building and Construction, Management Science and Operations Research, Visualization, Capital (economics), Industrial relations, Project management, business, Social network analysis
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_________::143d98346885893a4c40e898ffa5d786Test
https://doi.org/10.1061Test/(asce)me.1943-5479.0000891 -
4
المصدر: Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC).
مصطلحات موضوعية: Computer science, Industrial engineering, Optimal modeling, Adaptive reuse
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_________::7eebad50015039d361c96435e7c89e8fTest
https://doi.org/10.22260/isarc2019/0104Test -
5
المؤلفون: Benjamin Sanchez, Ekin Eray, Carl T. Haas
المصدر: Buildings; Volume 9; Issue 5; Pages: 105
Buildings, Vol 9, Iss 5, p 105 (2019)مصطلحات موضوعية: adaptive reuse of buildings, interface management system, circular economy, interface problems in construction projects, barriers in adaptive reuse projects, Integrated project delivery, Interface (Java), Computer science, Context (language use), Building and Construction, Ontology (information science), lcsh:TH1-9745, Engineering management, Redevelopment, Architecture, Management system, Built environment, lcsh:Building construction, Civil and Structural Engineering, Adaptive reuse
وصف الملف: application/pdf
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::2dbeb85b12a18a13344f419110bdaf9fTest
-
6
المؤلفون: Benjamin Sanchez, Ekin Eray, Carl T. Haas, Seokyoung Kang
المصدر: Advances in Informatics and Computing in Civil and Construction Engineering ISBN: 9783030002190
مصطلحات موضوعية: Class (computer programming), Conceptualization, business.industry, Interface (Java), Computer science, Circular economy, Sustainability, Ontology (information science), Software engineering, business, Track (rail transport), Adaptive reuse
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_________::816fd46f0f81b1511138f5872787cc1eTest
https://doi.org/10.1007/978-3-030-00220-6_87Test -
7
المؤلفون: Carl T. Haas, Mani Golparvar-Fard, Ekin Eray, Derek Rayside
المصدر: Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC).
مصطلحات موضوعية: Mass rapid transit, Conceptual framework, Computer science, Real-time computing, Completeness (statistics)
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_________::bf5999ca3911b4e3458b183a2c4322eeTest
https://doi.org/10.22260/isarc2018/0036Test -
8
المؤلفون: Seyda Baytekin, Ekin Eray, Gul Polat
المصدر: Procedia Engineering. 123:423-431
مصطلحات موضوعية: Actuarial science, Analytic hierarchy process, railway projects, Operations research, Computer science, bid mark-up, Estimator, Regression analysis, General Medicine, Bidding, Decision problem, Competition (economics), case study, Business continuity, regression analysis, Bid price, Engineering(all)
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::7a5d2a802bdb529979438e2f96cd5d9dTest
-
9
المصدر: Procedia Engineering. 123:415-422
مصطلحات موضوعية: Engineering, Analytic hierarchy process, Operations research, Management science, business.industry, Process (engineering), media_common.quotation_subject, Rank (computer programming), Evidential reasoning approach, General Medicine, evidential reasoning, case study, Work (electrical), Supplier relationship management, supplier selection, Quality (business), business, Engineering(all), Selection (genetic algorithm), media_common
الوصول الحر: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::6964e148df306c18ddf26d973ba0666dTest
https://doi.org/10.1016/j.proeng.2015.10.068Test