Decision-Making Model Based on Conditional Risks and Conditional Costs in Power System Probabilistic Planning.

التفاصيل البيبلوغرافية
العنوان: Decision-Making Model Based on Conditional Risks and Conditional Costs in Power System Probabilistic Planning.
المؤلفون: Wang, Xiuli1, Xie, Shaoyu1, Wang, Xifan2, Qu, Chong1
المصدر: IEEE Transactions on Power Systems. Nov2013, Vol. 28 Issue 4, p4080-4088. 9p.
مصطلحات موضوعية: *WIND power plants, *WIND power, *DECISION making, ELECTRIC power systems, ELECTRIC power consumption
مستخلص: The risk management and decision making for power systems have been evolving from the qualitative methods to the quantitative methods. The traditional decision-making model based on the system average risk and the average cost has commensurated events of low-probability/high-damage and events of high-probability/low-damage, which ignores the relative importance of these events as they are viewed by the decision makers. In this paper, we propose the concepts of conditional risk indices and conditional costs of power systems, and establish a novel risk decision-making model based on these indices. The conditional indices will be helpful for the risk decision makers to thoroughly tradeoff between different risk domains according to their preferences. Further, the system risk is monetarily represented as the reliability cost by the customer composite damage function, and the decision-making model is solved by sequential Monte Carlo simulation. Finally, the modified IEEE-RTS incorporating wind energy is investigated by the proposed model and method. The effects of decision preferences, the wind power capacity and cost on the system decision making are discussed. [ABSTRACT FROM PUBLISHER]
Copyright of IEEE Transactions on Power Systems is the property of IEEE and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Business Source Index
الوصف
تدمد:08858950
DOI:10.1109/TPWRS.2013.2257886