دورية أكاديمية

River basin change index for integrated river basin management of Langat River, Malaysia

التفاصيل البيبلوغرافية
العنوان: River basin change index for integrated river basin management of Langat River, Malaysia
المؤلفون: Foo-Hoat Lim, Wei-Koon Lee, Wei-Sze Khor, Lina Chan, Mohd Sofiyan Sulaiman, Hasrolnizam Shaari, Muhamad Khairi Jalil
المصدر: Water Policy, Vol 25, Iss 11, Pp 1035-1061 (2023)
بيانات النشر: IWA Publishing, 2023.
سنة النشر: 2023
المجموعة: LCC:River, lake, and water-supply engineering (General)
مصطلحات موضوعية: integrated river basin management (irbm), langat river basin, malaysia, river basin change index, selangor, River, lake, and water-supply engineering (General), TC401-506
الوصف: A river basin change index (RBCI) is introduced as a management tool to evaluate integrated river basin management (IRBM) implementation. The framework comprises water governance (WG), river basin organisation (RBO) and technical indicators. WG indicators encompass effectiveness, efficiency, trust and engagement. RBO indicators examine the management capacity and resources in operation and expansion. The technical indicators measure the outcome of IRBM implementation corresponding to each policy in the IRBM plan. Data sources range from questionnaire surveys, official reports and recorded data from the relevant agencies. The indices are calculated by comparing the current value to a reference value, which may be historical or target performance, or average performance of other river basins. RBCI value in the range of 0.9–1.1 characterises regular year-to-year fluctuation. A lower index value 1.1 indicates positive basin change which may be attributed to notable improvement, outstanding attainment or breakthrough advances in the basin IRBM in successive order. The tool is useful to facilitate long-term continuous improvement process and is presently undergoing pilot-testing for the Langat River basin, Malaysia HIGHLIGHTS An integrated river basin management (IRBM) assessment framework comprising water governance, river basin organisation and technical indicators is introduced.; A scoring system based on the ratio of current value to temporal/spatial/target reference value is used.; A novel river basin change index (RBCI) is proposed as a management tool to evaluate IRBM progress.; The approach is applied to the Langat River basin to review and revise the IRBM plan.;
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 1366-7017
1996-9759
العلاقة: http://wpol.iwaponline.com/content/25/11/1035Test; https://doaj.org/toc/1366-7017Test; https://doaj.org/toc/1996-9759Test
DOI: 10.2166/wp.2023.035
الوصول الحر: https://doaj.org/article/d15dfe1cac82407f826be6e44ab386a2Test
رقم الانضمام: edsdoj.15dfe1cac82407f826be6e44ab386a2
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:13667017
19969759
DOI:10.2166/wp.2023.035