-
1دورية أكاديمية
المؤلفون: He, Chuanni1 (AUTHOR) che22@ncsu.edu, Liu, Min2 (AUTHOR) mliu92@syr.edu, Zhang, YuXiang3 (AUTHOR) 185178387@qq.com, Wang, Zhigao4 (AUTHOR) 1415752931@qq.com, Hsiang, Simon M.5 (AUTHOR) shsiang1@uncc.edu, Chen, Gongfan1 (AUTHOR) gchen24@ncsu.edu, Chen, Jiang6 (AUTHOR) 967980@qq.com
المصدر: Journal of Management in Engineering. Jul2022, Vol. 38 Issue 4, p1-15. 15p.
مصطلحات موضوعية: *CRITICAL path analysis, *COVID-19 pandemic, *CONSTRUCTION management, SOCIAL distancing, CONSTRUCTION projects, BUILDING sites
-
2دورية أكاديمية
المؤلفون: San Cristobal, Jose Ramon
المصدر: Journal of Management in Engineering. Apr2013, Vol. 29 Issue 2, p158-163. 6p.
مصطلحات موضوعية: *CRITICAL path analysis, *MULTIPLE criteria decision making, *DECISION making, *OPERATIONS research, FUZZY sets
-
3دورية أكاديمية
المؤلفون: Ammar, Mohammad A.
المصدر: Journal of Construction Engineering & Management. Jan2013, Vol. 139 Issue 1, p44-50. 7p. 1 Diagram, 4 Charts, 7 Graphs.
مصطلحات موضوعية: *CRITICAL path analysis, *CONSTRUCTION project management, *LINE of balance (Management), *SCHEDULING, CONSTRUCTION projects
-
4دورية أكاديمية
المؤلفون: Ammar, Mohammad A.
المصدر: Journal of Construction Engineering & Management. Mar2012, Vol. 139 Issue 1, p44-50. 7p. 1 Illustration.
مصطلحات موضوعية: *CRITICAL path analysis, *LINE of balance (Management), *CONSTRUCTION project management, *PRODUCTION scheduling, *PRODUCTION control
-
5دورية أكاديمية
المؤلفون: Hegazy, Tarek1 tarek@uwaterloo.ca, Menesi, Wail2 wmenesi@engmail.uwaterloo.ca
المصدر: Journal of Construction Engineering & Management. Oct2010, Vol. 136 Issue 10, p1078-1085. 8p. 4 Diagrams, 5 Charts, 1 Graph.
مصطلحات موضوعية: *CRITICAL path analysis, *SCHEDULING, *DECISION support systems, *RESOURCE allocation, CONSTRUCTION projects
-
6دورية أكاديمية
المؤلفون: Kallantzis, Alexandros1, Soldatos, John2, Lambropoulos, Sergios3
المصدر: Journal of Construction Engineering & Management. Jul2007, Vol. 133 Issue 7, p483-491. 9p. 2 Diagrams, 5 Charts, 2 Graphs.
مصطلحات موضوعية: *SCHEDULING, *CRITICAL path analysis, *PRODUCTION scheduling, *NETWORK analysis (Planning), *DECISION making
-
7دورية أكاديميةSurvey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects.
المؤلفون: Galloway, Patricia D.1 patnwg@aol.com
المصدر: Journal of Construction Engineering & Management. Jul2006, Vol. 132 Issue 7, p697-711. 15p. 11 Graphs.
مصطلحات موضوعية: *CRITICAL path analysis, *PRODUCTION scheduling, *PROJECT management, *INDUSTRIAL surveys, *INDUSTRIAL management, CONSTRUCTION industry research, ARCHITECTURAL design
-
8دورية أكاديمية
المؤلفون: Lee, Dong-Eun1 dolee@siue.edu, Arditi, David2 arditi@iit.edu
المصدر: Journal of Construction Engineering & Management. Mar2006, Vol. 132 Issue 3, p268-277. 10p. 7 Black and White Photographs, 1 Chart.
مصطلحات موضوعية: *CRITICAL path analysis, *QUANTITATIVE research, *PROBABILITY theory, *PRODUCTION scheduling, *STATISTICS, *OPERATIONS research, *INDUSTRIAL engineering
-
9دورية أكاديمية
المؤلفون: Hegazy, Tarek1 tarek@uwaterloo.ca, Kehui Zhang2 k3zhang@uwaterloo.ca
المصدر: Journal of Construction Engineering & Management. May2005, Vol. 131 Issue 5, p505-512. 8p.
مصطلحات موضوعية: *CRITICAL path analysis, *DECISION making, *CONSTRUCTION industry, *INDUSTRIAL engineering, *ENGINEERING
-
10دورية أكاديمية
المؤلفون: Kim, Kyunghwan1 khkim6393@hotmail.com, de la Garza, Jesús M.2,3 chema@vt.edu
المصدر: Journal of Construction Engineering & Management. May2005, Vol. 131 Issue 5, p522-532. 11p.
مصطلحات موضوعية: *CRITICAL path analysis, *DECISION making, *INDUSTRIAL engineering, *PROJECT management, *ENGINEERING