Projected costs of generating electricity.
محفوظ في:
العنوان السابق: | Projected costs of generating electricity from power stations for commissioning in the period 1995-2000 |
---|---|
مؤلفون مشاركون: | , , |
الوثيقة: | كتاب |
اللغة: | English |
منشور في: |
Paris :
Organisation for Economic Co-operation and Development
|
الموضوعات: | |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
LEADER | 02384nam a2200517 a 4500 | ||
---|---|---|---|
001 | u4137 | ||
003 | sirsi | ||
005 | 20210211120104.0 | ||
008 | 060322c19929999fr x s i0 0eng c | ||
010 | |a 2008205274 |z 94232034 |z 98222889 | ||
022 | |a 2079-8385 |l 2079-8385 | ||
035 | |a (OCoLC)ocm65186317 | ||
040 | |a COD |b eng |c COD |d COD |d DLC |d WAU |d OCLCQ |d OCLCO |d OCLCF |d OCLCO |d CUS |d OCLCA |d OCLCQ | ||
042 | |a pcc | ||
050 | 0 | 0 | |a HD9685.A2 |b P752 |
082 | 0 | |2 21 |a 338.4362131 |b PRO | |
210 | 0 | |a Proj. costs gener. electr. |b (Print) | |
222 | 0 | |a Projected costs of generating electricity |b (Print) | |
245 | 0 | 0 | |a Projected costs of generating electricity. |
260 | |a Paris : |b Organisation for Economic Co-operation and Development | ||
300 | |a v. : |b ill. ; |c 27 cm. | ||
310 | |a Irregular | ||
362 | 1 | |a Began in 1992? | |
530 | |a Some reports also available online via the Internet. | ||
550 | |a Updates for <1998-2010> issued by International Energy Agency with OECD Nuclear Energy Agency. | ||
588 | |a Description based on: Update 1992. | ||
588 | |a Latest issue consulted: 2010 edition. | ||
650 | 0 | |a Electric utilities |x Costs |x Forecasting. |9 16876 | |
650 | 0 | |a Electric power-plants |x Costs. |9 16877 | |
650 | 0 | |a Nuclear industry |x Costs. |9 16878 | |
650 | 0 | |a Coal-fired power plants |x Costs. |9 16879 | |
650 | 7 | |a Coal-fired power plants |x Costs. |2 fast |0 (OCoLC)fst00865574 |9 16879 | |
650 | 7 | |a Electric power-plants |x Costs. |2 fast |0 (OCoLC)fst00905654 |9 25379 | |
650 | 7 | |a Electric utilities |x Costs |x Forecasting. |2 fast |0 (OCoLC)fst00905996 |9 25380 | |
650 | 7 | |a Nuclear industry |x Costs. |2 fast |0 (OCoLC)fst01040257 |9 25381 | |
710 | 2 | |a OECD Nuclear Energy Agency. |9 16880 | |
710 | 2 | |a International Energy Agency. |9 10400 | |
710 | 2 | |a Organisation for Economic Co-operation and Development. |9 10685 | |
776 | 0 | 8 | |i Online version: |t Projected costs of generating electricity |x 2079-8393 |w (OCoLC)316094213 |
780 | 0 | 0 | |t Projected costs of generating electricity from power stations for commissioning in the period 1995-2000 |
850 | |a DLC | ||
906 | |a 7 |b cbc |c serials |d 2 |e ncip |f 20 |g n-oclcserc | ||
942 | |2 ddc |c BK | ||
955 | |a db02 2008-02-01 |i db02 2008-02-01 | ||
999 | |c 4152 |d 4152 | ||
952 | |0 0 |1 0 |2 LC |4 0 |6 333_793200000000000_PRO |7 0 |9 36752 |a MAIN |b MAIN |c STACKS |d 2020-09-08 |h STACKS |l 0 |o 333.7932 PRO |p 33953000272345 |r 2019-10-07 |t 1 |w 2019-10-07 |y BK |